Triple
T13915008
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Tiantongyuan corridor |
E334598
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | commuter district |
C34364
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: commuter district Context triple: [Tiantongyuan corridor, instanceOf, commuter district]
-
A.
commuter town
A commuter town is a residential community where most residents travel to work in a nearby city or employment center rather than working locally.
-
B.
commuter rail zone
A commuter rail zone is a designated geographic area used to determine fares, ticketing, and service boundaries for regional passenger rail travel.
-
C.
metropolitan district
A metropolitan district is an administrative or governmental region that encompasses a central city and its surrounding urban and suburban areas, managed as a single integrated unit for planning, services, and governance.
-
D.
urban district gateway
An urban district gateway is a prominent physical or symbolic entry point that marks the transition into a distinct city district, shaping first impressions and aiding orientation and identity.
-
E.
transit-oriented development area
A transit-oriented development area is a compact, walkable, mixed-use urban district planned around high-quality public transportation to reduce car dependence and support sustainable living.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d81c5eaa9c819083b1ff8689179565 |
completed | April 9, 2026, 9:38 p.m. |
Created at: April 9, 2026, 10:16 p.m.