Triple
T13914631
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | 午门 |
E334588
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | 建筑物 |
C240
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: 建筑物 Context triple: [午门, instanceOf, 建筑物]
-
A.
building
chosen
A building is a constructed, often multi-level structure designed to provide shelter, space, and functional environments for human activities such as living, working, or storing goods.
-
B.
man_made_structure
A man_made_structure is any constructed physical entity or facility created by humans to serve functional, aesthetic, or protective purposes in the built environment.
-
C.
building section
A building section is a vertical cut-through representation of a structure that reveals its internal arrangement, construction elements, and spatial relationships from foundation to roof.
-
D.
civic building complex
A civic building complex is a coordinated group of public structures and spaces designed to house governmental, administrative, and community services within a unified physical setting.
-
E.
office building complex
An office building complex is a group of interconnected or closely situated office structures designed to provide workspace, shared amenities, and supporting services for multiple businesses or organizations.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d81c5eaa9c819083b1ff8689179565 |
completed | April 9, 2026, 9:38 p.m. |
Created at: April 9, 2026, 10:16 p.m.