Triple

T1390166
Position Surface form Disambiguated ID Type / Status
Subject Interstate 35W (Minnesota) E29935 entity
Predicate connectsWith P37 FINISHED
Object Interstate 94 E37450 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 94 | Statement: [Interstate 35W (Minnesota), connectsWith, Interstate 94]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Interstate 94
Context triple: [Interstate 35W (Minnesota), connectsWith, Interstate 94]
  • A. Interstate 94 chosen
    Interstate 94 is a major east–west U.S. Interstate Highway running from Montana to Michigan, serving key Midwestern cities such as Minneapolis–Saint Paul, Milwaukee, and Chicago.
  • B. Interstate 74
    Interstate 74 is a major east–west U.S. Interstate Highway that runs through multiple Midwestern and Southeastern states, including a segment in North Carolina.
  • C. Interstate 88
    Interstate 88 is a major east–west highway in Illinois that connects the Chicago metropolitan area with the Quad Cities and serves as a key regional transportation corridor.
  • D. Interstate 96
    Interstate 96 is a major east–west freeway in Michigan that connects the state capital Lansing with the Detroit metropolitan area and other key cities.
  • E. Interstate 75
    Interstate 75 is a major north–south U.S. Interstate Highway running from southern Florida through several states in the Midwest to the Canadian border in Michigan.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a498dc92f8819094a1108f8ac90f43 completed March 1, 2026, 7:51 p.m.
NER Named-entity recognition batch_69a4c35e023c8190b45688796d90534b completed March 1, 2026, 10:53 p.m.
NED1 Entity disambiguation (via context triple) batch_69c6e3ff314c8190b66f8b0a7ae3c039 completed March 27, 2026, 8:09 p.m.
Created at: March 1, 2026, 7:59 p.m.