Triple
T13899205
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Kew Pier |
E334174
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | river pier |
C34337
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: river pier Context triple: [Kew Pier, instanceOf, river pier]
-
A.
waterfront pier complex
A waterfront pier complex is a multi-use structure extending over the water that integrates docking facilities, public promenades, and commercial or recreational amenities along the shoreline.
-
B.
oceanographic research pier
An oceanographic research pier is a specialized coastal structure extending into the sea, equipped with instruments and facilities that allow scientists to conduct long-term, in situ studies of marine and atmospheric processes.
-
C.
fishing pier
A fishing pier is a raised structure extending from the shore over the water, designed to provide anglers with safe, convenient access to deeper fishing areas without using a boat.
-
D.
river bridge
A river bridge is a structure built to span a river, providing a stable pathway for vehicles, pedestrians, or rail traffic to cross from one bank to the other.
-
E.
Seine bridge
A Seine bridge is a structure that spans the River Seine, providing a crossing for pedestrians, vehicles, or trains while often serving as an architectural and cultural landmark within its urban setting.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d81c5eaa9c819083b1ff8689179565 |
completed | April 9, 2026, 9:38 p.m. |
Created at: April 9, 2026, 10:15 p.m.