Triple

T13891765
Position Surface form Disambiguated ID Type / Status
Subject Mareth Line E333989 entity
Predicate instanceOf P0 FINISHED
Object fortified defensive line C875 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: fortified defensive line
Context triple: [Mareth Line, instanceOf, fortified defensive line]
  • A. line of fortifications chosen
    A line of fortifications is a connected series of defensive structures, such as walls, trenches, and strongpoints, designed to protect a territory or position by forming a continuous or coordinated barrier against attack.
  • B. military fortification system
    A military fortification system is an integrated network of defensive structures, obstacles, and support facilities designed to protect territory, forces, and strategic assets from enemy attack.
  • C. fortified enclosure
    A fortified enclosure is a defended area surrounded by protective barriers such as walls, ramparts, or palisades, designed to control access and provide security against external threats.
  • D. fortified settlement
    A fortified settlement is a community enclosed by defensive structures such as walls, ramparts, or palisades, designed to protect its inhabitants and resources from external threats.
  • E. fortified town
    A fortified town is a settlement enclosed by defensive structures such as walls, towers, and gates, designed to protect its inhabitants and resources from external threats.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d81c5dd2d48190b7a5fc1e009de936 completed April 9, 2026, 9:38 p.m.
Created at: April 9, 2026, 10:15 p.m.