Triple

T13885081
Position Surface form Disambiguated ID Type / Status
Subject GE P32AC-DM E333820 entity
Predicate operator P179 FINISHED
Object CDOT E826238 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: CDOT | Statement: [GE P32AC-DM, operator, CDOT]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: CDOT
Context triple: [GE P32AC-DM, operator, CDOT]
  • A. CDOT
    CDOT is the municipal agency responsible for planning, building, and maintaining Chicago’s transportation infrastructure, including streets, sidewalks, and traffic systems.
  • B. CDOT
    CDOT is the Connecticut Department of Transportation, the state agency responsible for overseeing and operating Connecticut’s transportation infrastructure and services, including rail operations.
  • C. CDOT chosen
    CDOT is the state agency responsible for planning, building, and maintaining Colorado’s transportation infrastructure, including highways, bridges, and transit systems.
  • D. SDOT
    SDOT is the municipal agency responsible for planning, building, and maintaining Seattle’s transportation infrastructure and services.
  • E. TDOT
    TDOT is the state agency responsible for planning, building, and maintaining Tennessee’s transportation infrastructure, including highways, bridges, and public transit systems.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d81c5dd2d48190b7a5fc1e009de936 completed April 9, 2026, 9:38 p.m.
NER Named-entity recognition batch_69de23a101488190bd790b28033d38b9 completed April 14, 2026, 11:23 a.m.
NED1 Entity disambiguation (via context triple) batch_69f7c716166c8190a6323f8c01de06a5 completed May 3, 2026, 10:07 p.m.
Created at: April 9, 2026, 10:15 p.m.