Triple
T13857821
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Energy Independence and Security Act of 2007 |
E333108
|
entity |
| Predicate | establishes |
P986
|
FINISHED |
| Object |
Smart Grid Advisory Committee
The Smart Grid Advisory Committee is a federal advisory body that provides expert guidance to the U.S. government on policies, standards, and strategies for modernizing the nation’s electric grid with advanced “smart” technologies.
|
E1066960
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Smart Grid Advisory Committee | Statement: [Energy Independence and Security Act of 2007, establishes, Smart Grid Advisory Committee]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Smart Grid Advisory Committee Context triple: [Energy Independence and Security Act of 2007, establishes, Smart Grid Advisory Committee]
-
A.
IEEE International Conference on Smart Grid Communications
The IEEE International Conference on Smart Grid Communications is a leading annual research forum focused on communication technologies and networking solutions for modern and future smart power grids.
-
B.
IEEE 1547 distributed resources interconnection standard
The IEEE 1547 distributed resources interconnection standard is a key technical standard that defines the requirements for connecting distributed energy resources, such as solar and other small generators, to electric power systems to ensure safety, reliability, and interoperability.
-
C.
Electricity Infrastructure Operations Center
The Electricity Infrastructure Operations Center is a specialized research and simulation facility at Pacific Northwest National Laboratory focused on advancing the reliability, security, and modernization of the electric power grid.
-
D.
Energy and Electric Systems Group
The Energy and Electric Systems Group is a core Mitsubishi Electric business division focused on developing and supplying power, energy, and electrical infrastructure systems and solutions.
-
E.
Power Systems Engineering Committee
The Power Systems Engineering Committee is a technical body within the IEEE Industry Applications Society that focuses on the analysis, design, and application of electric power systems in industrial and commercial settings.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Smart Grid Advisory Committee Triple: [Energy Independence and Security Act of 2007, establishes, Smart Grid Advisory Committee]
Generated description
The Smart Grid Advisory Committee is a federal advisory body that provides expert guidance to the U.S. government on policies, standards, and strategies for modernizing the nation’s electric grid with advanced “smart” technologies.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Smart Grid Advisory Committee Target entity description: The Smart Grid Advisory Committee is a federal advisory body that provides expert guidance to the U.S. government on policies, standards, and strategies for modernizing the nation’s electric grid with advanced “smart” technologies.
-
A.
IEEE International Conference on Smart Grid Communications
The IEEE International Conference on Smart Grid Communications is a leading annual research forum focused on communication technologies and networking solutions for modern and future smart power grids.
-
B.
IEEE 1547 distributed resources interconnection standard
The IEEE 1547 distributed resources interconnection standard is a key technical standard that defines the requirements for connecting distributed energy resources, such as solar and other small generators, to electric power systems to ensure safety, reliability, and interoperability.
-
C.
Electricity Infrastructure Operations Center
The Electricity Infrastructure Operations Center is a specialized research and simulation facility at Pacific Northwest National Laboratory focused on advancing the reliability, security, and modernization of the electric power grid.
-
D.
Energy and Electric Systems Group
The Energy and Electric Systems Group is a core Mitsubishi Electric business division focused on developing and supplying power, energy, and electrical infrastructure systems and solutions.
-
E.
Power Systems Engineering Committee
The Power Systems Engineering Committee is a technical body within the IEEE Industry Applications Society that focuses on the analysis, design, and application of electric power systems in industrial and commercial settings.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d81c5ba13c8190839315f54768acfd |
completed | April 9, 2026, 9:38 p.m. |
| NER | Named-entity recognition | batch_69de02dc9f488190b7181dcb7e304632 |
completed | April 14, 2026, 9:03 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69f7c0fb7c3c819081fc6f89aa17d6af |
completed | May 3, 2026, 9:41 p.m. |
| NEDg | Description generation | batch_69f7c2c711948190ac614291592a7e03 |
completed | May 3, 2026, 9:48 p.m. |
| NED2 | Entity disambiguation (via description) | batch_69f7c36f28b48190b734a9e5e7ae39b9 |
completed | May 3, 2026, 9:51 p.m. |
Created at: April 9, 2026, 10:14 p.m.