Triple

T13856549
Position Surface form Disambiguated ID Type / Status
Subject Autodrome de Linas-Montlhéry E333079 entity
Predicate instanceOf P0 FINISHED
Object banked oval circuit C14360 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: banked oval circuit
Context triple: [Autodrome de Linas-Montlhéry, instanceOf, banked oval circuit]
  • A. Formula One circuit
    A Formula One circuit is a specialized racing track, either permanent or temporary, designed and certified to host Formula One Grand Prix events, featuring complex layouts, safety features, and facilities for teams, officials, and spectators.
  • B. motorcycle racing circuit
    A motorcycle racing circuit is a purpose-built or adapted closed course featuring straights, curves, and safety infrastructure designed specifically for competitive motorcycle racing.
  • C. auto racing track chosen
    An auto racing track is a specialized, closed-circuit roadway designed with specific layouts, surfaces, and safety features to facilitate competitive automobile racing events.
  • D. racing circuit corner complex
    A racing circuit corner complex is a sequence of interconnected turns designed to challenge drivers’ skill, influence racing lines and overtaking opportunities, and significantly affect lap time.
  • E. off-road racing circuit
    An off-road racing circuit is a purpose-built or natural-terrain course featuring unpaved surfaces, obstacles, and varied elevations designed for competitive racing of specialized off-road vehicles.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d81c5ba13c8190839315f54768acfd completed April 9, 2026, 9:38 p.m.
Created at: April 9, 2026, 10:14 p.m.