Triple

T13856328
Position Surface form Disambiguated ID Type / Status
Subject Igny E333073 entity
Predicate hasTransportConnection P845 FINISHED
Object RER line B E10905 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: RER line B | Statement: [Igny, hasTransportConnection, RER line B]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: RER line B
Context triple: [Igny, hasTransportConnection, RER line B]
  • A. RER B line chosen
    The RER B line is a major Paris regional express railway line that connects central Paris with key northern and southern suburbs, including Charles de Gaulle Airport.
  • B. RER line E
    RER line E is a Paris regional express railway line connecting central Paris with eastern suburbs such as Gagny.
  • C. RER Line C
    RER Line C is a major commuter rail line in the Paris RER network, running along the Seine and serving numerous suburbs and key destinations in the Île-de-France region.
  • D. RER line D
    RER line D is one of the main lines of the Paris RER suburban rail network, running north–south through central Paris and serving numerous suburbs across the Île-de-France region.
  • E. RER NG
    RER NG is a new-generation double-deck electric multiple unit train designed for Île-de-France’s RER network, offering higher capacity, improved accessibility, and enhanced passenger comfort.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d81c5ba13c8190839315f54768acfd completed April 9, 2026, 9:38 p.m.
NER Named-entity recognition batch_69de02dc9f488190b7181dcb7e304632 completed April 14, 2026, 9:03 a.m.
NED1 Entity disambiguation (via context triple) batch_69fd466ac0f08190b99dd4cdcef339c6 completed May 8, 2026, 2:11 a.m.
Created at: April 9, 2026, 10:14 p.m.