Triple

T1384578
Position Surface form Disambiguated ID Type / Status
Subject OMNY E29814 entity
Predicate rolloutCompleted P1574 FINISHED
Object around 2020s LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: around 2020s | Statement: [OMNY, rolloutCompleted, around 2020s]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: rolloutCompleted
Context triple: [OMNY, rolloutCompleted, around 2020s]
  • A. launchOutcome
    Indicates the result or consequence of a launch event, such as whether it succeeded, failed, or had a specific status or outcome.
  • B. completedIn chosen
    Indicates that an action, process, or task was fully finished within a specified time period or duration.
  • C. installationCompleted
    Indicates that the process of installing something has finished successfully.
  • D. conversionCompleted
    Indicates that a previously initiated conversion process has finished successfully.
  • E. isComplete
    Indicates that an action, process, or object has finished all required steps or reached its final state with nothing remaining to be done.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a498dc92f8819094a1108f8ac90f43 completed March 1, 2026, 7:51 p.m.
NER Named-entity recognition batch_69a4c33896548190b44f70c9aaaed9b6 completed March 1, 2026, 10:52 p.m.
PD Predicate disambiguation batch_69a4befe343c81909f758440a531b5be completed March 1, 2026, 10:34 p.m.
Created at: March 1, 2026, 7:59 p.m.