Triple
T13838692
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Via Lemovicensis |
E332594
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Camino de Santiago route |
C34250
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Camino de Santiago route Context triple: [Via Lemovicensis, instanceOf, Camino de Santiago route]
-
A.
Grande Randonnée route
A Grande Randonnée route is a long-distance, waymarked hiking trail, primarily found in Europe, designed for multi-day treks through varied natural and cultural landscapes.
-
B.
Chilean road
A Chilean road is a transportation route within Chile’s national or regional network, designed for vehicular travel and identified by a specific classification and numbering system.
-
C.
Spanish national road
A Spanish national road is a major public roadway within Spain’s national highway network that connects key cities and regions, facilitating long-distance vehicular travel and transport.
-
D.
U.S. Bicycle Route
A U.S. Bicycle Route is a nationally designated, numbered cycling corridor that connects states, regions, and key destinations across the United States using a mix of on-road and off-road facilities.
-
E.
National Tourist Route
A National Tourist Route is a designated roadway or travel corridor recognized for its exceptional scenic, cultural, and recreational value, developed and managed to enhance visitor experiences and promote regional tourism.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d81c5ae7c88190b0dd41bdafeb5999 |
completed | April 9, 2026, 9:38 p.m. |
Created at: April 9, 2026, 10:13 p.m.