Triple

T13837622
Position Surface form Disambiguated ID Type / Status
Subject Ideal city of Chaux E332571 entity
Predicate instanceOf P0 FINISHED
Object ideal city C21879 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: ideal city
Context triple: [Ideal city of Chaux, instanceOf, ideal city]
  • A. planned city
    A planned city is an urban area whose layout, infrastructure, and land use are deliberately designed and constructed according to a comprehensive plan before significant settlement occurs.
  • B. special city
    A special city is an urban area distinguished by unique characteristics—such as cultural significance, economic importance, historical heritage, or strategic location—that set it apart from typical cities.
  • C. utopian institution chosen
    A utopian institution is an idealized organization or system designed to perfectly embody and sustain a society’s highest values, such as equality, justice, and collective well-being, often without the flaws and constraints of real-world institutions.
  • D. city-state
    A city-state is an independent, self-governing urban center that exercises political, economic, and cultural control over its surrounding territory.
  • E. planned garden city
    A planned garden city is a deliberately designed urban settlement that integrates residential, commercial, and green spaces in a balanced layout to promote healthy living, social cohesion, and environmental sustainability.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d81c5ae7c88190b0dd41bdafeb5999 completed April 9, 2026, 9:38 p.m.
Created at: April 9, 2026, 10:13 p.m.