Triple

T13837621
Position Surface form Disambiguated ID Type / Status
Subject Ideal city of Chaux E332571 entity
Predicate instanceOf P0 FINISHED
Object utopian urban design project C33169 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: utopian urban design project
Context triple: [Ideal city of Chaux, instanceOf, utopian urban design project]
  • A. urban design project
    An urban design project is a coordinated planning and design effort that shapes the physical form, public spaces, infrastructure, and land use of a specific urban area to improve its functionality, aesthetics, and livability.
  • B. modernist urban design proposal
    A modernist urban design proposal is a conceptual plan for a city or district that emphasizes functional zoning, clean geometric forms, and the integration of architecture, infrastructure, and open space to achieve efficiency, order, and a forward-looking aesthetic.
  • C. visionary architecture project chosen
    A visionary architecture project is a forward-thinking, often speculative design concept that reimagines the built environment through innovative forms, technologies, and social or ecological paradigms beyond conventional practice.
  • D. planned city
    A planned city is an urban area whose layout, infrastructure, and land use are deliberately designed and constructed according to a comprehensive plan before significant settlement occurs.
  • E. urban design movement
    An urban design movement is a collective, often time-bound approach to shaping cities’ physical form, public spaces, and infrastructure based on shared social, cultural, environmental, and aesthetic principles.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d81c5ae7c88190b0dd41bdafeb5999 completed April 9, 2026, 9:38 p.m.
Created at: April 9, 2026, 10:13 p.m.