Triple

T13823806
Position Surface form Disambiguated ID Type / Status
Subject Ricola Storage Building Laufen E332199 entity
Predicate instanceOf P0 FINISHED
Object logistics building C23444 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: logistics building
Context triple: [Ricola Storage Building Laufen, instanceOf, logistics building]
  • A. warehouse building chosen
    A warehouse building is a large, typically open-plan structure designed for the storage, handling, and distribution of goods and materials.
  • B. logistics module
    A logistics module is a software component that manages the planning, execution, and tracking of the movement and storage of goods, information, and related resources across a supply chain.
  • C. industrial storage facility
    An industrial storage facility is a large, purpose-built structure designed to securely house, organize, and manage bulk materials, goods, or equipment used in manufacturing, logistics, or distribution operations.
  • D. library storage facility
    A library storage facility is a specialized space designed to house, preserve, and organize less frequently used library materials in a secure, climate-controlled environment while keeping them retrievable on demand.
  • E. warehousing company
    A warehousing company is a business that stores, manages, and handles goods and inventory on behalf of other organizations, often providing related services like packaging, distribution, and logistics coordination.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d81c5ae7c88190b0dd41bdafeb5999 completed April 9, 2026, 9:38 p.m.
Created at: April 9, 2026, 10:13 p.m.