Triple

T13813779
Position Surface form Disambiguated ID Type / Status
Subject David Wolf E331959 entity
Predicate spaceMission P68 FINISHED
Object STS-89 E396036 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: STS-89 | Statement: [David Wolf, spaceMission, STS-89]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: STS-89
Context triple: [David Wolf, spaceMission, STS-89]
  • A. STS-89 chosen
    STS-89 was a NASA Space Shuttle mission to the Russian Mir space station that conducted crew transfer and scientific research as part of the Shuttle–Mir program.
  • B. STS-86
    STS-86 was a 1997 NASA Space Shuttle mission that conducted a docking with the Russian Mir space station as part of the Shuttle–Mir program.
  • C. STS-88
    STS-88 was the first Space Shuttle mission to the International Space Station, delivering and assembling its initial U.S. and Russian modules in orbit.
  • D. STS-79
    STS-79 was a 1996 Space Shuttle Atlantis mission notable for delivering supplies to the Russian Mir space station and returning astronaut Shannon Lucid to Earth after her long-duration stay in orbit.
  • E. STS-69
    STS-69 was a 1995 NASA Space Shuttle Endeavour mission that deployed and retrieved multiple scientific payloads, including the Wake Shield Facility, to conduct microgravity and materials science experiments in low Earth orbit.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d81c59f8808190a851bc56afdc55e9 completed April 9, 2026, 9:38 p.m.
NER Named-entity recognition batch_69de027198f8819095da3e714ac241f5 completed April 14, 2026, 9:01 a.m.
NED1 Entity disambiguation (via context triple) batch_69fe64e47f1c8190a4ad09bc96d35b69 completed May 8, 2026, 10:34 p.m.
Created at: April 9, 2026, 10:12 p.m.