Triple

T13784790
Position Surface form Disambiguated ID Type / Status
Subject I-485 E331225 entity
Predicate hasJunctionWith P1018 FINISHED
Object NC 49 E494512 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: NC 49 | Statement: [I-485, hasJunctionWith, NC 49]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: NC 49
Context triple: [I-485, hasJunctionWith, NC 49]
  • A. NC 540
    NC 540 is a toll highway in North Carolina that forms part of the Research Triangle Expressway serving the Raleigh–Durham area.
  • B. North Carolina Highway 540
    North Carolina Highway 540 is a major toll freeway forming part of the Raleigh Outer Loop around the Raleigh–Durham area in North Carolina.
  • C. North Carolina Highway 49 chosen
    North Carolina Highway 49 is a primary state highway running generally southwest–northeast across central North Carolina, connecting cities such as Charlotte, Asheboro, and Roxboro.
  • D. North Carolina Highway 200
    North Carolina Highway 200 is a primary state highway in North Carolina that connects Monroe to other communities in the south-central part of the state, serving as an important regional route for local and through traffic.
  • E. North Carolina Highway 700
    North Carolina Highway 700 is a primary state highway in North Carolina that serves as a regional connector route in the northern part of the state.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d81c58feb08190a77bca8bf7d6d20f completed April 9, 2026, 9:38 p.m.
NER Named-entity recognition batch_69de0248db988190aa43c3723af25f90 completed April 14, 2026, 9 a.m.
NED1 Entity disambiguation (via context triple) batch_69f7b07b0b2881909b316e3cc67f1ec1 completed May 3, 2026, 8:30 p.m.
Created at: April 9, 2026, 10:11 p.m.