Triple

T13781936
Position Surface form Disambiguated ID Type / Status
Subject Q School E331151 entity
Predicate instanceOf P0 FINISHED
Object snooker qualifying tournament series C34167 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: snooker qualifying tournament series
Context triple: [Q School, instanceOf, snooker qualifying tournament series]
  • A. professional snooker tour
    The professional snooker tour is an organized series of elite, ranking and non-ranking snooker tournaments held worldwide in which qualified professional players compete for prize money, ranking points, and titles under the governance of the sport’s official bodies.
  • B. Olympic qualifying tournament
    An Olympic qualifying tournament is a competitive event or series of events through which athletes or teams earn the right to participate in the Olympic Games by meeting specific performance standards or rankings.
  • C. international badminton tournament
    An international badminton tournament is a large-scale, officially sanctioned competition where elite players or national teams from multiple countries compete in structured matches to determine champions across various event categories.
  • D. continental championship qualifiers
    Continental championship qualifiers are the preliminary competitions or stages through which teams or individuals earn the right to participate in a continent-wide championship tournament.
  • E. golf playoff series
    A golf playoff series is a sequence of additional holes or matches played under specific tie-breaking rules to determine a winner when competitors are tied after regulation play.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d81c58feb08190a77bca8bf7d6d20f completed April 9, 2026, 9:38 p.m.
Created at: April 9, 2026, 10:11 p.m.