Triple

T13781402
Position Surface form Disambiguated ID Type / Status
Subject Calendar Grand Slam E331138 entity
Predicate requiresWinning P20842 FINISHED
Object all four major tournaments LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: all four major tournaments | Statement: [Calendar Grand Slam, requiresWinning, all four major tournaments]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: requiresWinning
Context triple: [Calendar Grand Slam, requiresWinning, all four major tournaments]
  • A. numberOfWinsRequired
    Indicates the specific count of wins an entity must achieve to meet a defined goal, threshold, or condition.
  • B. wonFor
    Indicates that one entity received an award, prize, or recognition specifically on behalf of or representing another entity.
  • C. conditionOfVictory chosen
    Indicates the specific circumstances or criteria under which a participant is considered to have won.
  • D. winnerState
    Indicates the state or condition of an entity that has achieved victory or been declared the winner in a given context.
  • E. wonAt
    Indicates that one entity achieved victory or success in a specific event, competition, or context.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d81c583b0081909e408a17db517a21 completed April 9, 2026, 9:38 p.m.
NER Named-entity recognition batch_69de02460a688190a27874f8d35819c7 completed April 14, 2026, 9 a.m.
PD Predicate disambiguation batch_69dbbe98b5bc8190967907ec64d0317d completed April 12, 2026, 3:47 p.m.
Created at: April 9, 2026, 10:11 p.m.