Triple
T13779083
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | TOP Programme |
E331088
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | transformation programme |
C30802
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: transformation programme Context triple: [TOP Programme, instanceOf, transformation programme]
-
A.
economic transformation program
An economic transformation program is a coordinated set of policies and initiatives designed to fundamentally restructure and modernize an economy to achieve sustainable, inclusive growth and increased competitiveness.
-
B.
programme of work
A programme of work is a structured, time-bound collection of related tasks and activities organized to achieve specific objectives or deliver defined outcomes.
-
C.
programme
chosen
A programme is a structured sequence of planned activities or events designed to achieve specific objectives within a defined context or timeframe.
-
D.
development program
A development program is a structured set of coordinated activities and resources designed to systematically improve skills, capabilities, or conditions within a specific group, organization, or community over time.
-
E.
regional development programme
A regional development programme is a coordinated set of policies, investments, and initiatives designed to stimulate economic growth, improve infrastructure, and enhance social well-being within a specific geographic area.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d81c583b0081909e408a17db517a21 |
completed | April 9, 2026, 9:38 p.m. |
Created at: April 9, 2026, 10:11 p.m.