Triple
T1377831
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Barton Swing Aqueduct |
E29265
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | movable navigable aqueduct |
C4026
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: movable navigable aqueduct Context triple: [Barton Swing Aqueduct, instanceOf, movable navigable aqueduct]
-
A.
movable bridge
chosen
A movable bridge is a type of bridge with a deck or section that can be mechanically raised, lowered, rotated, or otherwise repositioned to allow the passage of water or land traffic beneath or through it.
-
B.
navigable waterway
A navigable waterway is a natural or artificial body of water, such as a river, canal, or channel, that is deep and wide enough for vessels to travel safely for transportation or commerce.
-
C.
stone arch bridge
A stone arch bridge is a structure composed of curved stone arches that span a gap, using the compressive strength of masonry to support loads and provide passage over obstacles like rivers or valleys.
-
D.
covered bridge
A covered bridge is a typically wooden, roofed structure that spans a waterway or gap, enclosing its roadway to protect the supporting framework from weather and extend its lifespan.
-
E.
vertical-lift bridge
A vertical-lift bridge is a movable bridge whose central span rises vertically between two towers to allow river or maritime traffic to pass beneath while maintaining a level roadway.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a498d883a48190bfdca525296ef7ee |
completed | March 1, 2026, 7:51 p.m. |
Created at: March 1, 2026, 7:59 p.m.