Triple

T13775076
Position Surface form Disambiguated ID Type / Status
Subject Gavins Point Dam E330983 entity
Predicate partOf P40 FINISHED
Object Pick–Sloan Missouri Basin Program E537360 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Pick–Sloan Missouri Basin Program | Statement: [Gavins Point Dam, partOf, Pick–Sloan Missouri Basin Program]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Pick–Sloan Missouri Basin Program
Context triple: [Gavins Point Dam, partOf, Pick–Sloan Missouri Basin Program]
  • A. Pick-Sloan Missouri Basin Program chosen
    The Pick-Sloan Missouri Basin Program is a major mid-20th-century U.S. federal water resources development initiative that created a system of dams, reservoirs, and related infrastructure along the Missouri River for flood control, irrigation, hydropower, and navigation.
  • B. Fryingpan–Arkansas Project
    The Fryingpan–Arkansas Project is a major U.S. water diversion and storage system in Colorado that transfers water from the Western Slope to the Arkansas River Basin for irrigation, municipal use, and hydroelectric power.
  • C. Shoshone Project
    The Shoshone Project is a U.S. Bureau of Reclamation irrigation and water management development in Wyoming that harnesses the Shoshone River through dams, reservoirs, and canals to support agriculture and regional growth.
  • D. Colorado-Big Thompson Project
    The Colorado-Big Thompson Project is a major transbasin water diversion and storage system in Colorado that delivers Colorado River water to the arid eastern plains for agriculture, cities, and industry.
  • E. Colorado River Basin Salinity Control Program
    The Colorado River Basin Salinity Control Program was a federal initiative aimed at reducing salt loading in the Colorado River to protect water quality for agricultural, municipal, and environmental uses across the basin.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d81c583b0081909e408a17db517a21 completed April 9, 2026, 9:38 p.m.
NER Named-entity recognition batch_69de0238bdbc8190a946e6e5431632a5 completed April 14, 2026, 9 a.m.
NED1 Entity disambiguation (via context triple) batch_69f7a86afd788190ab637044dd489a24 completed May 3, 2026, 7:56 p.m.
Created at: April 9, 2026, 10:10 p.m.