Triple
T1377246
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | European Union economic and monetary union |
E29252
|
entity |
| Predicate | phase |
P5784
|
FINISHED |
| Object |
Stage Three of EMU
Stage Three of EMU is the final phase of the European Union’s economic and monetary integration, marked by the adoption of the euro and the implementation of a single monetary policy under the European Central Bank.
|
E158742
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Stage Three of EMU | Statement: [European Union economic and monetary union, phase, Stage Three of EMU]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Stage Three of EMU Context triple: [European Union economic and monetary union, phase, Stage Three of EMU]
-
A.
Fourth Stage
Fourth Stage is an intimate performance venue within Ottawa’s National Arts Centre that hosts a variety of music, theatre, and community-focused events.
-
B.
New Stage
New Stage is a modern performance venue of the Bolshoi Theatre complex in Moscow, designed to host opera, ballet, and other productions with updated technical facilities.
-
C.
Third Powerhouse
The Third Powerhouse is a major hydroelectric generating facility added to the Grand Coulee Dam complex to significantly increase its power production capacity.
-
D.
EMD
EMD is the commonly used abbreviation for the Engineering Management Division, a professional group focused on the practice and advancement of engineering management.
-
E.
Third Week
Third Week is a key phase in Ignatius of Loyola’s Spiritual Exercises that focuses on meditating on the passion and suffering of Jesus Christ.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Stage Three of EMU Triple: [European Union economic and monetary union, phase, Stage Three of EMU]
Generated description
Stage Three of EMU is the final phase of the European Union’s economic and monetary integration, marked by the adoption of the euro and the implementation of a single monetary policy under the European Central Bank.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Stage Three of EMU Target entity description: Stage Three of EMU is the final phase of the European Union’s economic and monetary integration, marked by the adoption of the euro and the implementation of a single monetary policy under the European Central Bank.
-
A.
Fourth Stage
Fourth Stage is an intimate performance venue within Ottawa’s National Arts Centre that hosts a variety of music, theatre, and community-focused events.
-
B.
New Stage
New Stage is a modern performance venue of the Bolshoi Theatre complex in Moscow, designed to host opera, ballet, and other productions with updated technical facilities.
-
C.
Third Powerhouse
The Third Powerhouse is a major hydroelectric generating facility added to the Grand Coulee Dam complex to significantly increase its power production capacity.
-
D.
EMD
EMD is the commonly used abbreviation for the Engineering Management Division, a professional group focused on the practice and advancement of engineering management.
-
E.
EMD
EMD is the vehicle registration code assigned to the German town of Emden.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a498d883a48190bfdca525296ef7ee |
completed | March 1, 2026, 7:51 p.m. |
| NER | Named-entity recognition | batch_69a4c31602b8819087a57e8d390cae7a |
completed | March 1, 2026, 10:52 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69acd488698481909411c004aadfcaec |
completed | March 8, 2026, 1:44 a.m. |
| NEDg | Description generation | batch_69acd625592481908c688802ce8381ee |
completed | March 8, 2026, 1:51 a.m. |
| NED2 | Entity disambiguation (via description) | batch_69acd6daf83881909cf5a4105ebf14a5 |
completed | March 8, 2026, 1:54 a.m. |
Created at: March 1, 2026, 7:59 p.m.