Triple

T13768218
Position Surface form Disambiguated ID Type / Status
Subject Hrazdan River E330805 entity
Predicate hasDam P8736 FINISHED
Object Yerevan-3 HPP dam E1059860 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Yerevan-3 HPP dam | Statement: [Hrazdan River, hasDam, Yerevan-3 HPP dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Yerevan-3 HPP dam
Context triple: [Hrazdan River, hasDam, Yerevan-3 HPP dam]
  • A. Yerevan-1 HPP dam chosen
    The Yerevan-1 HPP dam is a hydroelectric power plant structure in Yerevan, Armenia, that harnesses the Hrazdan River to generate electricity.
  • B. Yerevan railway station
    Yerevan railway station is the main railway terminal in Armenia’s capital, serving as a key hub for domestic and international train services, including routes to neighboring Georgia.
  • C. Dashnaktsutyun
    Dashnaktsutyun is the commonly used name for the Armenian Revolutionary Federation, a historic Armenian nationalist and socialist political party and movement.
  • D. Yerevan Metro
    Yerevan Metro is the rapid transit system serving Armenia’s capital city, providing underground rail transportation across key urban areas.
  • E. Mingachevir Hydroelectric Power Station
    Mingachevir Hydroelectric Power Station is a major hydroelectric power plant on the Kura River in Azerbaijan, serving as one of the country’s largest sources of electricity generation.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d81c583b0081909e408a17db517a21 completed April 9, 2026, 9:38 p.m.
NER Named-entity recognition batch_69de0233ecc48190b934f085d2501eb1 completed April 14, 2026, 9 a.m.
NED1 Entity disambiguation (via context triple) batch_69f7b0724ab481908448d71a1bd02253 completed May 3, 2026, 8:30 p.m.
Created at: April 9, 2026, 10:10 p.m.