Triple
T13766251
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Rajpura |
E330750
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Industrial town |
C4144
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Industrial town Context triple: [Rajpura, instanceOf, Industrial town]
-
A.
industrial town
chosen
An industrial town is a settlement whose economy and landscape are dominated by factories, warehouses, and related infrastructure supporting manufacturing and heavy industry.
-
B.
former industrial town
A former industrial town is a community whose economy and identity were once dominated by manufacturing or heavy industry but have since declined or transitioned to other forms of economic activity.
-
C.
industrial center
An industrial center is a concentrated area where manufacturing, production, and related economic activities are clustered, supported by specialized infrastructure and labor.
-
D.
industrial district
An industrial district is a designated urban or regional area characterized by a high concentration of manufacturing, warehousing, and related industrial activities supported by specialized infrastructure and services.
-
E.
railway town
A railway town is a settlement whose origin, growth, and economic life are primarily shaped by the construction, operation, and services of a nearby railway line or station.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d81c583b0081909e408a17db517a21 |
completed | April 9, 2026, 9:38 p.m. |
Created at: April 9, 2026, 10:10 p.m.