Triple

T13764781
Position Surface form Disambiguated ID Type / Status
Subject California State Route 125 E330710 entity
Predicate connectsTo P845 FINISHED
Object State Route 52 NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: State Route 52 | Statement: [California State Route 125, connectsTo, State Route 52]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: State Route 52
Context triple: [California State Route 125, connectsTo, State Route 52]
  • A. State Route 52 chosen
    State Route 52 is a major east–west freeway in San Diego, California, connecting coastal and inland communities across the northern part of the city.
  • B. State Route 520
    State Route 520 is a major east–west highway in the Seattle metropolitan area that includes the floating bridge across Lake Washington and serves as a key commuter route between Seattle and its eastern suburbs.
  • C. State Route 522
    State Route 522 is a major state highway in Washington that connects Seattle and its northeastern suburbs, serving as a key commuter and regional traffic corridor.
  • D. State Route 525
    State Route 525 is a state highway in Washington that connects the Mukilteo-Clinton ferry terminal on Whidbey Island to the mainland road network.
  • E. State Route 59
    State Route 59 is a north–south state highway in California’s Central Valley that connects the city of Merced with surrounding rural areas and other regional routes.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d81c583b0081909e408a17db517a21 completed April 9, 2026, 9:38 p.m.
NER Named-entity recognition batch_69de022690ac8190bd5410ecc659a2a7 completed April 14, 2026, 9 a.m.
Created at: April 9, 2026, 10:10 p.m.