Triple

T13740463
Position Surface form Disambiguated ID Type / Status
Subject South Wales Metro E330071 entity
Predicate includesLine P2124 FINISHED
Object Ebbw Vale Line E504545 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Ebbw Vale Line | Statement: [South Wales Metro, includesLine, Ebbw Vale Line]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Ebbw Vale Line
Context triple: [South Wales Metro, includesLine, Ebbw Vale Line]
  • A. Ebbw Vale line chosen
    The Ebbw Vale line is a railway route in South Wales that connects Ebbw Vale with larger towns and cities, providing both commuter and regional passenger services.
  • B. Rhymney Line
    The Rhymney Line is a suburban railway route in South Wales that connects Cardiff with the town of Rhymney, forming part of the Valley Lines network.
  • C. Merthyr Line
    The Merthyr Line is a commuter rail route in South Wales that connects Cardiff with Merthyr Tydfil and surrounding Valleys communities.
  • D. Maesteg Line
    The Maesteg Line is a commuter rail route in South Wales connecting Maesteg with larger hubs such as Cardiff via Bridgend.
  • E. Rhondda Line
    The Rhondda Line is a commuter rail route in South Wales that runs through the Rhondda Valleys, connecting local communities with larger hubs such as Pontypridd and Cardiff.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d80772315881908f980cae40d91664 completed April 9, 2026, 8:09 p.m.
NER Named-entity recognition batch_69de0206a4b88190a60914e2b43e54f9 completed April 14, 2026, 8:59 a.m.
NED1 Entity disambiguation (via context triple) batch_69f7b06b7d1481909a318086d76d3af0 completed May 3, 2026, 8:30 p.m.
Created at: April 9, 2026, 9:55 p.m.