Triple

T13740430
Position Surface form Disambiguated ID Type / Status
Subject Central Electricity Generating Board E330070 entity
Predicate abbreviation P43 FINISHED
Object CEGB E330070 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: CEGB | Statement: [Central Electricity Generating Board, abbreviation, CEGB]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: CEGB
Context triple: [Central Electricity Generating Board, abbreviation, CEGB]
  • A. CGE
    CGE is a French association that brings together the country’s leading grandes écoles, representing elite higher education and research institutions.
  • B. CGE
    CGE is the abbreviation for Compagnie Générale d’Electricité, a former major French industrial and telecommunications conglomerate.
  • C. CGE
    CGE is the national governing body responsible for selecting and managing England’s team for the Commonwealth Games and related events.
  • D. Central Electricity Board
    The Central Electricity Board was a UK public body responsible for developing and operating the national electricity grid and coordinating power generation before being replaced by later electricity authorities.
  • E. Central Electricity Generating Board chosen
    The Central Electricity Generating Board was the state-owned body responsible for electricity generation and bulk transmission in England and Wales from the late 1950s until privatization in the early 1990s.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d80772315881908f980cae40d91664 completed April 9, 2026, 8:09 p.m.
NER Named-entity recognition batch_69de0206a4b88190a60914e2b43e54f9 completed April 14, 2026, 8:59 a.m.
NED1 Entity disambiguation (via context triple) batch_69f79d6bce9881909209231f6dfcf9bf completed May 3, 2026, 7:09 p.m.
Created at: April 9, 2026, 9:55 p.m.