Triple
T13740430
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Central Electricity Generating Board |
E330070
|
entity |
| Predicate | abbreviation |
P43
|
FINISHED |
| Object | CEGB |
E330070
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: CEGB | Statement: [Central Electricity Generating Board, abbreviation, CEGB]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: CEGB Context triple: [Central Electricity Generating Board, abbreviation, CEGB]
-
A.
CGE
CGE is a French association that brings together the country’s leading grandes écoles, representing elite higher education and research institutions.
-
B.
CGE
CGE is the abbreviation for Compagnie Générale d’Electricité, a former major French industrial and telecommunications conglomerate.
-
C.
CGE
CGE is the national governing body responsible for selecting and managing England’s team for the Commonwealth Games and related events.
-
D.
Central Electricity Board
The Central Electricity Board was a UK public body responsible for developing and operating the national electricity grid and coordinating power generation before being replaced by later electricity authorities.
-
E.
Central Electricity Generating Board
chosen
The Central Electricity Generating Board was the state-owned body responsible for electricity generation and bulk transmission in England and Wales from the late 1950s until privatization in the early 1990s.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d80772315881908f980cae40d91664 |
completed | April 9, 2026, 8:09 p.m. |
| NER | Named-entity recognition | batch_69de0206a4b88190a60914e2b43e54f9 |
completed | April 14, 2026, 8:59 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69f79d6bce9881909209231f6dfcf9bf |
completed | May 3, 2026, 7:09 p.m. |
Created at: April 9, 2026, 9:55 p.m.