Triple
T13740396
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Central Electricity Generating Board |
E330070
|
entity |
| Predicate | predecessor |
P97
|
FINISHED |
| Object | British Electricity Authority |
E190009
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: British Electricity Authority | Statement: [Central Electricity Generating Board, predecessor, British Electricity Authority]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: British Electricity Authority Context triple: [Central Electricity Generating Board, predecessor, British Electricity Authority]
-
A.
British Electricity Authority
chosen
The British Electricity Authority was the nationalized body responsible for generating and supplying electricity in Great Britain in the early post-World War II period.
-
B.
Southern Electricity Board
The Southern Electricity Board was a regional public utility in the United Kingdom responsible for distributing and supplying electricity to consumers in the southern part of England before industry privatization.
-
C.
Central Electricity Generating Board
The Central Electricity Generating Board was the state-owned body responsible for electricity generation and bulk transmission in England and Wales from the late 1950s until privatization in the early 1990s.
-
D.
London Electricity Board
The London Electricity Board was a regional public utility responsible for distributing and supplying electricity to consumers in the London area during much of the 20th century.
-
E.
Eastern Electricity Board
The Eastern Electricity Board was a regional public utility in the United Kingdom responsible for distributing and supplying electricity across the eastern part of England before the privatization of the electricity industry.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d80772315881908f980cae40d91664 |
completed | April 9, 2026, 8:09 p.m. |
| NER | Named-entity recognition | batch_69de0206a4b88190a60914e2b43e54f9 |
completed | April 14, 2026, 8:59 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69f79d6bce9881909209231f6dfcf9bf |
completed | May 3, 2026, 7:09 p.m. |
Created at: April 9, 2026, 9:55 p.m.