Triple
T13664722
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Arda |
E327086
|
entity |
| Predicate | hasDam |
P8736
|
FINISHED |
| Object |
Studen Kladenets Dam
Studen Kladenets Dam is a large hydroelectric and irrigation reservoir on the Arda River in southern Bulgaria, known for its scenic surroundings and role in regional water management.
|
E1055048
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Studen Kladenets Dam | Statement: [Arda, hasDam, Studen Kladenets Dam]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Studen Kladenets Dam Context triple: [Arda, hasDam, Studen Kladenets Dam]
-
A.
Votkinsk Dam
Votkinsk Dam is a major hydroelectric dam on the Kama River in Russia, integral to regional power generation and water management.
-
B.
Mozhaysk Dam
Mozhaysk Dam is a hydraulic structure in Russia that impounds the Mozhaysk Reservoir, serving regional water supply, flood control, and related purposes.
-
C.
Grishk Dam
Grishk Dam is a hydroelectric and irrigation dam located on the Helmand River in southern Afghanistan.
-
D.
Edea Dam
Edea Dam is a major hydroelectric power facility in Cameroon that harnesses the flow of the Sanaga River to generate electricity.
-
E.
Novosibirsk Dam
Novosibirsk Dam is a major hydroengineering structure on the Ob River in Russia, built to regulate water flow, support hydroelectric power generation, and create the large Novosibirsk Reservoir.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Studen Kladenets Dam Triple: [Arda, hasDam, Studen Kladenets Dam]
Generated description
Studen Kladenets Dam is a large hydroelectric and irrigation reservoir on the Arda River in southern Bulgaria, known for its scenic surroundings and role in regional water management.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Studen Kladenets Dam Target entity description: Studen Kladenets Dam is a large hydroelectric and irrigation reservoir on the Arda River in southern Bulgaria, known for its scenic surroundings and role in regional water management.
-
A.
Votkinsk Dam
Votkinsk Dam is a major hydroelectric dam on the Kama River in Russia, integral to regional power generation and water management.
-
B.
Mozhaysk Dam
Mozhaysk Dam is a hydraulic structure in Russia that impounds the Mozhaysk Reservoir, serving regional water supply, flood control, and related purposes.
-
C.
Grishk Dam
Grishk Dam is a hydroelectric and irrigation dam located on the Helmand River in southern Afghanistan.
-
D.
Edea Dam
Edea Dam is a major hydroelectric power facility in Cameroon that harnesses the flow of the Sanaga River to generate electricity.
-
E.
Novosibirsk Dam
Novosibirsk Dam is a major hydroengineering structure on the Ob River in Russia, built to regulate water flow, support hydroelectric power generation, and create the large Novosibirsk Reservoir.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8076d8270819092afc2f0e9c359a8 |
completed | April 9, 2026, 8:09 p.m. |
| NER | Named-entity recognition | batch_69dbc622a07c81909ef7fb55e719dd9a |
completed | April 12, 2026, 4:19 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69f7943bfaf0819097410e901847d77c |
completed | May 3, 2026, 6:30 p.m. |
| NEDg | Description generation | batch_69f79655d5f08190a3cbf3e12e2ffa67 |
completed | May 3, 2026, 6:39 p.m. |
| NED2 | Entity disambiguation (via description) | batch_69f7972a1cf48190a1d435227414967a |
completed | May 3, 2026, 6:42 p.m. |
Created at: April 9, 2026, 9:52 p.m.