Triple

T13647332
Position Surface form Disambiguated ID Type / Status
Subject Porce River E326137 entity
Predicate hasHydroelectricPlant P15311 FINISHED
Object Porce II Hydroelectric Power Plant
Porce II Hydroelectric Power Plant is a major hydroelectric facility in Colombia that generates electricity by harnessing the flow of the Porce River.
E1056152 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Porce II Hydroelectric Power Plant | Statement: [Porce River, hasHydroelectricPlant, Porce II Hydroelectric Power Plant]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Porce II Hydroelectric Power Plant
Context triple: [Porce River, hasHydroelectricPlant, Porce II Hydroelectric Power Plant]
  • A. Porce I Hydroelectric Power Plant
    Porce I Hydroelectric Power Plant is a major hydroelectric facility in Colombia that harnesses the flow of the Porce River to generate electricity for the national grid.
  • B. Maria Cristina Hydroelectric Plant
    The Maria Cristina Hydroelectric Plant is a major hydroelectric power facility in the Philippines, known for harnessing the Maria Cristina Falls to supply electricity to Mindanao.
  • C. Peligre hydroelectric plant
    The Peligre hydroelectric plant is a major dam and power station in Haiti that provides a significant portion of the country’s electricity by harnessing the flow of the Artibonite River.
  • D. Funil Hydroelectric Plant
    The Funil Hydroelectric Plant is a Brazilian power station that generates electricity from the waters of the Paraíba do Sul River.
  • E. Machicura hydropower plant
    The Machicura hydropower plant is a hydroelectric facility in Chile that forms part of the larger Maule hydropower complex, contributing renewable energy generation to the regional power grid.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Porce II Hydroelectric Power Plant
Triple: [Porce River, hasHydroelectricPlant, Porce II Hydroelectric Power Plant]
Generated description
Porce II Hydroelectric Power Plant is a major hydroelectric facility in Colombia that generates electricity by harnessing the flow of the Porce River.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Porce II Hydroelectric Power Plant
Target entity description: Porce II Hydroelectric Power Plant is a major hydroelectric facility in Colombia that generates electricity by harnessing the flow of the Porce River.
  • A. Porce I Hydroelectric Power Plant
    Porce I Hydroelectric Power Plant is a major hydroelectric facility in Colombia that harnesses the flow of the Porce River to generate electricity for the national grid.
  • B. Maria Cristina Hydroelectric Plant
    The Maria Cristina Hydroelectric Plant is a major hydroelectric power facility in the Philippines, known for harnessing the Maria Cristina Falls to supply electricity to Mindanao.
  • C. Peligre hydroelectric plant
    The Peligre hydroelectric plant is a major dam and power station in Haiti that provides a significant portion of the country’s electricity by harnessing the flow of the Artibonite River.
  • D. Funil Hydroelectric Plant
    The Funil Hydroelectric Plant is a Brazilian power station that generates electricity from the waters of the Paraíba do Sul River.
  • E. Machicura hydropower plant
    The Machicura hydropower plant is a hydroelectric facility in Chile that forms part of the larger Maule hydropower complex, contributing renewable energy generation to the regional power grid.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8076beddc8190a53156f5bea77f5e completed April 9, 2026, 8:09 p.m.
NER Named-entity recognition batch_69dbc6073e888190965456a639839749 completed April 12, 2026, 4:19 p.m.
NED1 Entity disambiguation (via context triple) batch_69f7943610488190838719ad31207c52 completed May 3, 2026, 6:30 p.m.
NEDg Description generation batch_69f7955fce288190a7e426f467517a91 completed May 3, 2026, 6:35 p.m.
NED2 Entity disambiguation (via description) batch_69f7996cddf08190973e493fb788ce7a completed May 3, 2026, 6:52 p.m.
Created at: April 9, 2026, 9:52 p.m.