Triple

T13646528
Position Surface form Disambiguated ID Type / Status
Subject Farmington River E326115 entity
Predicate hasStructure P35 FINISHED
Object Saville Dam E821074 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Saville Dam | Statement: [Farmington River, hasStructure, Saville Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Saville Dam
Context triple: [Farmington River, hasStructure, Saville Dam]
  • A. Saville Dam chosen
    Saville Dam is a large masonry dam in Barkhamsted, Connecticut, that creates the Barkhamsted Reservoir, a major water supply source for the Hartford area.
  • B. Cluny Dam
    Cluny Dam is a hydroelectric dam on Tasmania’s Derwent River that forms part of the state’s power generation and water management system.
  • C. Albion Dam
    Albion Dam is a historic mill dam on the Blackstone River in Lincoln, Rhode Island, associated with the former industrial village of Albion.
  • D. O’Sullivan Dam
    O’Sullivan Dam is a major earth-fill dam in central Washington State that forms Potholes Reservoir and plays a key role in irrigation and water management for the Columbia Basin Project.
  • E. Keswick Dam
    Keswick Dam is a concrete gravity dam on the Sacramento River in Northern California that regulates flows and generates hydroelectric power as part of the region’s large federal water management system.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8076beddc8190a53156f5bea77f5e completed April 9, 2026, 8:09 p.m.
NER Named-entity recognition batch_69dbc6073e888190965456a639839749 completed April 12, 2026, 4:19 p.m.
NED1 Entity disambiguation (via context triple) batch_69f78af948408190bca7f2e46863391e completed May 3, 2026, 5:50 p.m.
Created at: April 9, 2026, 9:51 p.m.