Triple

T13637595
Position Surface form Disambiguated ID Type / Status
Subject I-80/I-90 in Indiana E325888 entity
Predicate partOfCorridor P840 FINISHED
Object Chicago–New York highway corridor
The Chicago–New York highway corridor is a major interstate transportation route linking the Chicago metropolitan area with the New York City region, carrying heavy volumes of long-distance passenger and freight traffic across the Midwestern and Northeastern United States.
E1054106 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Chicago–New York highway corridor | Statement: [I-80/I-90 in Indiana, partOfCorridor, Chicago–New York highway corridor]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Chicago–New York highway corridor
Context triple: [I-80/I-90 in Indiana, partOfCorridor, Chicago–New York highway corridor]
  • A. I-88 Corridor
    The I-88 Corridor is a major suburban business and technology hub in Illinois, home to numerous corporate headquarters, research facilities, and high-tech industries along Interstate 88 west of Chicago.
  • B. Northwest–East Corridor
    The Northwest–East Corridor is a major transit route in Baltimore’s public transportation network that includes Penn–North station among its stops.
  • C. I-94 corridor
    The I-94 corridor is a major interstate transportation route in the Midwestern United States that connects key urban centers and includes segments such as the Kennedy Expressway in Chicago.
  • D. East-West Tollway corridor
    The East-West Tollway corridor is a major suburban business and technology hub in the Chicago metropolitan area, known for its concentration of corporate headquarters, research facilities, and educational institutions along Interstate 88 in Illinois.
  • E. I-20 corridor
    The I-20 corridor is a major east–west interstate route in the southern United States that connects cities across states such as Texas, Louisiana, Mississippi, Alabama, Georgia, and South Carolina, serving as a key artery for regional travel and commerce.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Chicago–New York highway corridor
Triple: [I-80/I-90 in Indiana, partOfCorridor, Chicago–New York highway corridor]
Generated description
The Chicago–New York highway corridor is a major interstate transportation route linking the Chicago metropolitan area with the New York City region, carrying heavy volumes of long-distance passenger and freight traffic across the Midwestern and Northeastern United States.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Chicago–New York highway corridor
Target entity description: The Chicago–New York highway corridor is a major interstate transportation route linking the Chicago metropolitan area with the New York City region, carrying heavy volumes of long-distance passenger and freight traffic across the Midwestern and Northeastern United States.
  • A. I-88 Corridor
    The I-88 Corridor is a major suburban business and technology hub in Illinois, home to numerous corporate headquarters, research facilities, and high-tech industries along Interstate 88 west of Chicago.
  • B. Northwest–East Corridor
    The Northwest–East Corridor is a major transit route in Baltimore’s public transportation network that includes Penn–North station among its stops.
  • C. I-94 corridor
    The I-94 corridor is a major interstate transportation route in the Midwestern United States that connects key urban centers and includes segments such as the Kennedy Expressway in Chicago.
  • D. East-West Tollway corridor
    The East-West Tollway corridor is a major suburban business and technology hub in the Chicago metropolitan area, known for its concentration of corporate headquarters, research facilities, and educational institutions along Interstate 88 in Illinois.
  • E. I-20 corridor
    The I-20 corridor is a major east–west interstate route in the southern United States that connects cities across states such as Texas, Louisiana, Mississippi, Alabama, Georgia, and South Carolina, serving as a key artery for regional travel and commerce.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8076beddc8190a53156f5bea77f5e completed April 9, 2026, 8:09 p.m.
NER Named-entity recognition batch_69dbc5a84cc4819098a975e33250c89b completed April 12, 2026, 4:17 p.m.
NED1 Entity disambiguation (via context triple) batch_69f78af297008190b12256c936714213 completed May 3, 2026, 5:50 p.m.
NEDg Description generation batch_69f78f1aca288190b4a0af0dd4e96c50 completed May 3, 2026, 6:08 p.m.
NED2 Entity disambiguation (via description) batch_69f790d7bce08190b56fb03b0586ee52 completed May 3, 2026, 6:15 p.m.
Created at: April 9, 2026, 9:51 p.m.