Triple
T1363756
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | East Tennessee Technology Park |
E29155
|
entity |
| Predicate | formerlyKnownAs |
P65
|
FINISHED |
| Object |
Oak Ridge Gaseous Diffusion Plant
The Oak Ridge Gaseous Diffusion Plant was a major U.S. uranium enrichment facility in Oak Ridge, Tennessee, built during the Manhattan Project and later used for Cold War nuclear fuel production.
|
E168165
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Oak Ridge Gaseous Diffusion Plant | Statement: [East Tennessee Technology Park, formerlyKnownAs, Oak Ridge Gaseous Diffusion Plant]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Oak Ridge Gaseous Diffusion Plant Context triple: [East Tennessee Technology Park, formerlyKnownAs, Oak Ridge Gaseous Diffusion Plant]
-
A.
Paducah Gaseous Diffusion Plant
The Paducah Gaseous Diffusion Plant is a former U.S. Department of Energy uranium enrichment facility in western Kentucky that played a major role in producing enriched uranium for nuclear power and defense.
-
B.
Portsmouth Gaseous Diffusion Plant (historical)
The Portsmouth Gaseous Diffusion Plant was a major U.S. uranium enrichment facility in Ohio that played a key role in producing enriched uranium for nuclear weapons and commercial nuclear power during the Cold War.
-
C.
Y-12 National Security Complex
The Y-12 National Security Complex is a U.S. Department of Energy facility central to nuclear weapons production, uranium processing, and national security operations.
-
D.
Oak Ridge Reservation
Oak Ridge Reservation is a large U.S. Department of Energy site in Oak Ridge, Tennessee, historically central to the Manhattan Project and now a major center for nuclear research, environmental management, and national security work.
-
E.
Savannah River Site
Savannah River Site is a U.S. Department of Energy nuclear reservation in South Carolina historically used for producing materials for nuclear weapons and now focused on environmental cleanup and nuclear materials management.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Oak Ridge Gaseous Diffusion Plant Triple: [East Tennessee Technology Park, formerlyKnownAs, Oak Ridge Gaseous Diffusion Plant]
Generated description
The Oak Ridge Gaseous Diffusion Plant was a major U.S. uranium enrichment facility in Oak Ridge, Tennessee, built during the Manhattan Project and later used for Cold War nuclear fuel production.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Oak Ridge Gaseous Diffusion Plant Target entity description: The Oak Ridge Gaseous Diffusion Plant was a major U.S. uranium enrichment facility in Oak Ridge, Tennessee, built during the Manhattan Project and later used for Cold War nuclear fuel production.
-
A.
Paducah Gaseous Diffusion Plant
The Paducah Gaseous Diffusion Plant is a former U.S. Department of Energy uranium enrichment facility in western Kentucky that played a major role in producing enriched uranium for nuclear power and defense.
-
B.
Portsmouth Gaseous Diffusion Plant (historical)
The Portsmouth Gaseous Diffusion Plant was a major U.S. uranium enrichment facility in Ohio that played a key role in producing enriched uranium for nuclear weapons and commercial nuclear power during the Cold War.
-
C.
Y-12 National Security Complex
The Y-12 National Security Complex is a U.S. Department of Energy facility central to nuclear weapons production, uranium processing, and national security operations.
-
D.
Oak Ridge Reservation
Oak Ridge Reservation is a large U.S. Department of Energy site in Oak Ridge, Tennessee, historically central to the Manhattan Project and now a major center for nuclear research, environmental management, and national security work.
-
E.
Savannah River Site
Savannah River Site is a U.S. Department of Energy nuclear reservation in South Carolina historically used for producing materials for nuclear weapons and now focused on environmental cleanup and nuclear materials management.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a498d77abc8190913bf57e5f51d2c4 |
completed | March 1, 2026, 7:51 p.m. |
| NER | Named-entity recognition | batch_69a4c2b5d05c81908b49e282648e073a |
completed | March 1, 2026, 10:50 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69ad0e63b3f88190b34fb0407e1f03d5 |
completed | March 8, 2026, 5:51 a.m. |
| NEDg | Description generation | batch_69ad0ec5e9dc8190bdf3d679e57f1aa1 |
completed | March 8, 2026, 5:53 a.m. |
| NED2 | Entity disambiguation (via description) | batch_69ad12d79cd48190819b3540270c64f0 |
completed | March 8, 2026, 6:10 a.m. |
Created at: March 1, 2026, 7:57 p.m.