Triple

T13636906
Position Surface form Disambiguated ID Type / Status
Subject Active Queue Management E325871 entity
Predicate aimsToOptimizeTradeoffBetween P9277 FINISHED
Object throughput and delay LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: throughput and delay | Statement: [Active Queue Management, aimsToOptimizeTradeoffBetween, throughput and delay]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: aimsToOptimizeTradeoffBetween
Context triple: [Active Queue Management, aimsToOptimizeTradeoffBetween, throughput and delay]
  • A. hasTradeoff
    Indicates that one option or outcome involves a compromise in which gaining certain benefits requires accepting corresponding costs or disadvantages.
  • B. hasDesignTradeoff
    Indicates that one design choice involves compromises or conflicting benefits and drawbacks relative to other possible designs.
  • C. aimsToBalance chosen
    Indicates an intention or effort by one entity to bring multiple elements, forces, or conditions into a state of equilibrium.
  • D. optimizationTarget
    Indicates that one entity is the goal or objective that another entity is trying to improve, optimize, or make more efficient.
  • E. typeOfOptimality
    Indicates that one entity specifies the particular notion or criterion of optimality that characterizes another entity’s optimal status or solution.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8076beddc8190a53156f5bea77f5e completed April 9, 2026, 8:09 p.m.
NER Named-entity recognition batch_69dbc60635d08190899806fe8936f02a completed April 12, 2026, 4:19 p.m.
PD Predicate disambiguation batch_69dbbe85e1c4819095194f4b7f9f6118 completed April 12, 2026, 3:47 p.m.
Created at: April 9, 2026, 9:51 p.m.