Triple
T13617627
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | LaSalle Street canyon |
E325360
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | street canyon |
C1088
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: street canyon Context triple: [LaSalle Street canyon, instanceOf, street canyon]
-
A.
street
chosen
A street is a public thoroughfare in an urban or suburban area, typically bordered by buildings, that facilitates vehicular and pedestrian movement and often supports various social and commercial activities.
-
B.
urban street grid
An urban street grid is a planned network of intersecting streets, typically arranged in a regular, rectangular pattern, that organizes city blocks, guides movement, and shapes land use within an urban area.
-
C.
laneway
A laneway is a narrow passage or alley, typically running between or behind buildings, used for access, services, or pedestrian movement.
-
D.
urban promenade
An urban promenade is a designed public walkway or boulevard in a city, intended for leisurely strolling, social interaction, and visual enjoyment of the surrounding urban landscape.
-
E.
urban beltway
An urban beltway is a high-capacity circumferential highway or roadway system that encircles a city to route traffic around its core, reduce congestion, and connect radial routes and suburbs.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8076aae28819092cf636190ee5529 |
completed | April 9, 2026, 8:09 p.m. |
Created at: April 9, 2026, 9:50 p.m.