Triple

T13604446
Position Surface form Disambiguated ID Type / Status
Subject Williamsville Water Mill Complex E325024 entity
Predicate instanceOf P0 FINISHED
Object water mill C1355 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: water mill
Context triple: [Williamsville Water Mill Complex, instanceOf, water mill]
  • A. water-powered mill chosen
    A water-powered mill is a structure that uses the energy of flowing or falling water, typically via a waterwheel or turbine, to drive mechanical processes such as grinding grain, sawing wood, or generating power.
  • B. windmill
    A windmill is a structure that converts the kinetic energy of wind into mechanical energy, traditionally used for tasks such as grinding grain, pumping water, or generating electricity.
  • C. steam-powered mill
    A steam-powered mill is an industrial facility that uses steam engines to drive machinery for grinding grain or processing raw materials, enabling continuous, high-capacity production independent of wind or water power.
  • D. water-lifting device
    A water-lifting device is a mechanism designed to raise water from a lower elevation to a higher one for purposes such as irrigation, supply, or drainage.
  • E. hydroelectric dam
    A hydroelectric dam is a large engineered structure that stores and controls river water to drive turbines and generate electricity while managing water flow and levels.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d80769eaf081909d82f44e484d6113 completed April 9, 2026, 8:09 p.m.
Created at: April 9, 2026, 9:50 p.m.