Triple
T1360016
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Adelphi Footbridge |
E29076
|
entity |
| Predicate | isPartOf |
P10
|
FINISHED |
| Object |
Greater Manchester pedestrian network
The Greater Manchester pedestrian network is an interconnected system of walkways, footbridges, and paths designed to facilitate safe and convenient walking routes across the Greater Manchester area.
|
E155700
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Greater Manchester pedestrian network | Statement: [Adelphi Footbridge, isPartOf, Greater Manchester pedestrian network]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Greater Manchester pedestrian network Context triple: [Adelphi Footbridge, isPartOf, Greater Manchester pedestrian network]
-
A.
Birmingham city centre pedestrian network
The Birmingham city centre pedestrian network is an interconnected system of walkways, streets, and public spaces that facilitates safe and convenient foot travel throughout Birmingham’s central urban area.
-
B.
Greater Manchester rail network
The Greater Manchester rail network is a coordinated system of suburban and regional train services that connects Manchester with its surrounding towns and cities across the metropolitan county.
-
C.
Greater Manchester Transport Strategy
The Greater Manchester Transport Strategy is a long-term regional plan that sets out how transport across Greater Manchester will be developed and improved to support economic growth, sustainability, and better connectivity.
-
D.
Greater Manchester Strategy
The Greater Manchester Strategy is the long-term plan guiding economic growth, public services, and social well-being across the Greater Manchester city-region.
-
E.
Greater Manchester commuter belt
The Greater Manchester commuter belt is the suburban and semi-rural area surrounding Greater Manchester from which residents commonly travel into the city-region for work and services.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Greater Manchester pedestrian network Triple: [Adelphi Footbridge, isPartOf, Greater Manchester pedestrian network]
Generated description
The Greater Manchester pedestrian network is an interconnected system of walkways, footbridges, and paths designed to facilitate safe and convenient walking routes across the Greater Manchester area.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Greater Manchester pedestrian network Target entity description: The Greater Manchester pedestrian network is an interconnected system of walkways, footbridges, and paths designed to facilitate safe and convenient walking routes across the Greater Manchester area.
-
A.
Birmingham city centre pedestrian network
The Birmingham city centre pedestrian network is an interconnected system of walkways, streets, and public spaces that facilitates safe and convenient foot travel throughout Birmingham’s central urban area.
-
B.
Greater Manchester rail network
The Greater Manchester rail network is a coordinated system of suburban and regional train services that connects Manchester with its surrounding towns and cities across the metropolitan county.
-
C.
Greater Manchester Transport Strategy
The Greater Manchester Transport Strategy is a long-term regional plan that sets out how transport across Greater Manchester will be developed and improved to support economic growth, sustainability, and better connectivity.
-
D.
Greater Manchester Strategy
The Greater Manchester Strategy is the long-term plan guiding economic growth, public services, and social well-being across the Greater Manchester city-region.
-
E.
Greater Manchester commuter belt
The Greater Manchester commuter belt is the suburban and semi-rural area surrounding Greater Manchester from which residents commonly travel into the city-region for work and services.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a498d77abc8190913bf57e5f51d2c4 |
completed | March 1, 2026, 7:51 p.m. |
| NER | Named-entity recognition | batch_69a4c2b156b081909c99ada70a969fc0 |
completed | March 1, 2026, 10:50 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69acce725fec819085f6de8e6e368aa4 |
completed | March 8, 2026, 1:18 a.m. |
| NEDg | Description generation | batch_69accf9ac120819084c21fb7b88c050a |
completed | March 8, 2026, 1:23 a.m. |
| NED2 | Entity disambiguation (via description) | batch_69accffa9a40819083a3e55a5d83e040 |
completed | March 8, 2026, 1:25 a.m. |
Created at: March 1, 2026, 7:56 p.m.