Triple

T13591549
Position Surface form Disambiguated ID Type / Status
Subject Krishnaraja Wadiyar IV E324702 entity
Predicate infrastructurePolicy P101959 FINISHED
Object modernization of roads and public works in Mysore LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: modernization of roads and public works in Mysore | Statement: [Krishnaraja Wadiyar IV, infrastructurePolicy, modernization of roads and public works in Mysore]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: infrastructurePolicy
Context triple: [Krishnaraja Wadiyar IV, infrastructurePolicy, modernization of roads and public works in Mysore]
  • A. infrastructureManager
    Indicates a relationship where one entity is responsible for overseeing, maintaining, or administering the infrastructure of another entity or system.
  • B. integrationPolicy
    Indicates the rules or strategy governing how separate components, systems, or processes are combined and made to work together.
  • C. parallelInfrastructure
    Indicates that two or more infrastructure elements are arranged or operate in parallel to each other, typically serving similar functions simultaneously.
  • D. supportsInfrastructure
    Indicates that one entity provides resources, services, or capabilities that enable the operation, maintenance, or development of another entity’s infrastructure.
  • E. establishedPolicy chosen
    Indicates that a policy has been formally created, adopted, and put into effect as a guiding rule or standard.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d80769eaf081909d82f44e484d6113 completed April 9, 2026, 8:09 p.m.
NER Named-entity recognition batch_69dbb056ce088190a6feb4266633d18b completed April 12, 2026, 2:46 p.m.
PD Predicate disambiguation batch_69dbae18eaf48190809e8b365856cde9 completed April 12, 2026, 2:37 p.m.
Created at: April 9, 2026, 9:49 p.m.