Triple

T13588517
Position Surface form Disambiguated ID Type / Status
Subject Indonesian railway network E324631 entity
Predicate electrifiedArea P94567 FINISHED
Object Greater Jakarta commuter network E143874 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Greater Jakarta commuter network | Statement: [Indonesian railway network, electrifiedArea, Greater Jakarta commuter network]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Greater Jakarta commuter network
Context triple: [Indonesian railway network, electrifiedArea, Greater Jakarta commuter network]
  • A. Greater Jakarta chosen
    Greater Jakarta is Indonesia’s largest metropolitan area, encompassing Jakarta and its surrounding cities and suburbs as the country’s primary political, economic, and urban hub.
  • B. Greater Manila Area transport network
    The Greater Manila Area transport network is the interconnected system of roads, railways, and other transit corridors that facilitates the movement of people and goods across Metro Manila and its surrounding urban regions.
  • C. Jakarta MRT
    Jakarta MRT is a rapid transit system serving Indonesia’s capital region, designed to reduce congestion and improve urban mobility through modern, high-capacity rail services.
  • D. Jakarta LRT
    Jakarta LRT is a light rail transit system serving parts of the Greater Jakarta metropolitan area in Indonesia, designed to alleviate traffic congestion and improve urban mobility.
  • E. Jakarta BRT (TransJakarta)
    Jakarta BRT (TransJakarta) is a bus rapid transit system in Indonesia’s capital that uses dedicated lanes and high-capacity buses to provide mass public transportation across the city.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: electrifiedArea
Context triple: [Indonesian railway network, electrifiedArea, Greater Jakarta commuter network]
  • A. electrificationTerminusOf
    Indicates that a location or point serves as the end of an electrified section of a route, line, or network.
  • B. isElectrifiedSectionOf
    Indicates that one section or segment is a part of a larger entity and has been equipped with electrical power or electrification.
  • C. railElectrificationIncludes chosen
    Indicates that a rail electrification system or project encompasses, covers, or incorporates a specified segment, component, or area of railway infrastructure.
  • D. electrificationServedBy
    Indicates that the electrification of a system, area, or infrastructure is provided, supported, or enabled by a specified source, service, or entity.
  • E. electrificationUsedBetween
    Indicates that an electrification system or method is applied or present along the segment or connection between two entities.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d80769100c819099111274614f5ed2 completed April 9, 2026, 8:09 p.m.
NER Named-entity recognition batch_69dbb055cc98819091fab597b69e5e3e completed April 12, 2026, 2:46 p.m.
NED1 Entity disambiguation (via context triple) batch_69f76bc347b881908267455f3bdd50e8 completed May 3, 2026, 3:37 p.m.
PD Predicate disambiguation batch_69dbae18eaf48190809e8b365856cde9 completed April 12, 2026, 2:37 p.m.
Created at: April 9, 2026, 9:49 p.m.