Triple

T13581914
Position Surface form Disambiguated ID Type / Status
Subject Bay of Green Bay E324439 entity
Predicate instanceOf P0 FINISHED
Object arm of Lake Michigan C33243 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: arm of Lake Michigan
Context triple: [Bay of Green Bay, instanceOf, arm of Lake Michigan]
  • A. Lake Michigan ferry route
    A Lake Michigan ferry route is a designated waterway and schedule by which passenger and vehicle ferries regularly transport people and goods across Lake Michigan between specific ports.
  • B. arm of Puget Sound
    An arm of Puget Sound is a smaller, branching inlet or extension of the main Puget Sound waterway, typically characterized by narrower channels that reach inland and connect to bays, coves, or river mouths.
  • C. Michigan state park
    A Michigan state park is a publicly managed natural or recreational area within the state of Michigan, designated for conservation, outdoor activities, and public enjoyment.
  • D. Great Lake
    A Great Lake is one of a group of five vast, interconnected freshwater lakes in North America, notable for their size, ecological significance, and role in transportation and regional climate.
  • E. arm of San Francisco Bay
    An arm of San Francisco Bay is a smaller, elongated inlet or extension of the main bay that reaches into surrounding land areas, often forming distinct sub-bays or channels.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d80769100c819099111274614f5ed2 completed April 9, 2026, 8:09 p.m.
Created at: April 9, 2026, 9:48 p.m.