Triple
T13562642
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Jackson (CTA Red Line station) |
E323946
|
entity |
| Predicate | connectsNorthTo |
P110371
|
FINISHED |
| Object | Monroe (CTA Red Line station) |
E1042499
|
NE FINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Monroe (CTA Red Line station) | Statement: [Jackson (CTA Red Line station), connectsNorthTo, Monroe (CTA Red Line station)]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Monroe (CTA Red Line station) Context triple: [Jackson (CTA Red Line station), connectsNorthTo, Monroe (CTA Red Line station)]
-
A.
Monroe (CTA Red Line station)
chosen
Monroe is an underground Chicago 'L' station on the Red Line located in the downtown Loop area.
-
B.
Howard station (CTA Red Line)
Howard station (CTA Red Line) is a major Chicago Transit Authority rail terminal on the city’s North Side that serves as an interchange between the Red, Purple, and Yellow Lines.
-
C.
Jackson (CTA Red Line station)
Jackson is a major Chicago Transit Authority Red Line subway station located in downtown Chicago’s Loop, serving as a key transfer point within the city’s rapid transit system.
-
D.
Pulaski station (CTA Orange Line)
Pulaski station (CTA Orange Line) is an elevated rapid transit stop on Chicago’s Orange Line serving the West Elsdon neighborhood near Midway Airport.
-
E.
Chicago Avenue station (CTA Red Line)
Chicago Avenue station (CTA Red Line) is an underground Chicago Transit Authority rapid transit stop on the Red Line serving the Near North Side area, including the Magnificent Mile.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: connectsNorthTo Context triple: [Jackson (CTA Red Line station), connectsNorthTo, Monroe (CTA Red Line station)]
-
A.
northernConnection
Indicates a relationship where one entity is connected to another primarily through or via its northern side, direction, or region.
-
B.
northernTerminusConnects
Indicates that a route, line, or pathway connects to or ends at a specified location at its northernmost terminus.
-
C.
connectsCityTo
Indicates a relationship in which a route, infrastructure, or link joins one city to another, enabling connection or interaction between them.
-
D.
northernBranch
Indicates that one entity functions as the northern division, section, or offshoot of another entity.
-
E.
northernExtensionLocatedIn
Indicates that the northern extension or northernmost part of one entity is geographically located within the area or boundaries of another entity.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8076830b48190910a902bae5888e2 |
completed | April 9, 2026, 8:09 p.m. |
| NER | Named-entity recognition | batch_69dbbb9ee3f081909056dc1a92c40b7a |
completed | April 12, 2026, 3:34 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69f76bb1ef508190ab587bd2aa34795b |
completed | May 3, 2026, 3:37 p.m. |
| PD | Predicate disambiguation | batch_69dbae13bec4819084c1770638c00ed9 |
completed | April 12, 2026, 2:37 p.m. |
| PDg | Predicate description generation | batch_69dbbb8c77dc8190b7bd803b5e168d23 |
completed | April 12, 2026, 3:34 p.m. |
Created at: April 9, 2026, 9:47 p.m.