Triple

T13555021
Position Surface form Disambiguated ID Type / Status
Subject Grand Commun, Versailles E323747 entity
Predicate instanceOf P0 FINISHED
Object building of the Palace of Versailles C3901 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: building of the Palace of Versailles
Context triple: [Grand Commun, Versailles, instanceOf, building of the Palace of Versailles]
  • A. Baroque palace
    A Baroque palace is a grand, ornately decorated residence characterized by dramatic architecture, elaborate ornamentation, and richly detailed interiors designed to display power and opulence.
  • B. former royal residence chosen
    A former royal residence is a historic building or estate that once served as an official home for a monarch or royal family but no longer functions in that capacity.
  • C. ducal residence
    A ducal residence is the primary home or official palace of a duke or duchess, serving as both a private dwelling and a symbol of their rank and authority.
  • D. château
    A château is a large, often grand country house or castle, typically found in France, that historically served as a noble residence and sometimes as a fortified stronghold.
  • E. part of Topkapi Palace
    A part of Topkapi Palace represents a distinct architectural or functional section within the historic Ottoman palace complex, such as a courtyard, pavilion, gate, or residential quarter.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8076830b48190910a902bae5888e2 completed April 9, 2026, 8:09 p.m.
Created at: April 9, 2026, 9:47 p.m.