Triple
T1354954
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Sowerby Bridge Wharf |
E28966
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | canal wharf |
C6957
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: canal wharf Context triple: [Sowerby Bridge Wharf, instanceOf, canal wharf]
-
A.
canal
A canal is a man-made waterway constructed to facilitate transportation, irrigation, drainage, or water management between different locations.
-
B.
seaport
A seaport is a coastal facility equipped with harbors, docks, and infrastructure to enable the loading, unloading, storage, and transfer of cargo and passengers between sea and land transportation.
-
C.
waterfront district
A waterfront district is an urban or suburban area located along a body of water, characterized by mixed-use development, public access to the shoreline, and activities centered around recreation, commerce, and scenic views.
-
D.
waterfront pier complex
A waterfront pier complex is a multi-use structure extending over the water that integrates docking facilities, public promenades, and commercial or recreational amenities along the shoreline.
-
E.
harbor
A harbor is a sheltered body of water, often equipped with docks and facilities, where ships can anchor safely for loading, unloading, and protection from rough seas.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a498571d248190a0ac9eb02d97097f |
completed | March 1, 2026, 7:49 p.m. |
Created at: March 1, 2026, 7:56 p.m.