Triple

T13532518
Position Surface form Disambiguated ID Type / Status
Subject New York Coliseum (remodeling and additions) E323169 entity
Predicate instanceOf P0 FINISHED
Object building renovation project C5246 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: building renovation project
Context triple: [New York Coliseum (remodeling and additions), instanceOf, building renovation project]
  • A. architectural renovation project chosen
    An architectural renovation project is a coordinated effort to redesign, upgrade, and adapt an existing building or space to meet new functional, aesthetic, regulatory, and sustainability requirements while preserving or enhancing its structural integrity and character.
  • B. architectural remodeling project
    An architectural remodeling project is a coordinated effort to redesign, upgrade, or reconfigure an existing structure’s spaces, systems, and aesthetics to better meet current functional, regulatory, and stylistic requirements.
  • C. building alteration
    A building alteration is a modification or change to an existing structure’s design, layout, or components that does not constitute complete demolition or new construction.
  • D. building section
    A building section is a vertical cut-through representation of a structure that reveals its internal arrangement, construction elements, and spatial relationships from foundation to roof.
  • E. United Nations renovation project
    The United Nations renovation project is a comprehensive, multi-year initiative to modernize, secure, and sustainably upgrade UN headquarters facilities while preserving their historic and diplomatic functions.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8076776248190bdf0d4fa1f85a5fc completed April 9, 2026, 8:09 p.m.
Created at: April 9, 2026, 9:44 p.m.