Triple

T13529068
Position Surface form Disambiguated ID Type / Status
Subject Kristall E323084 entity
Predicate builtBy P972 FINISHED
Object NPO Energia E931519 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: NPO Energia | Statement: [Kristall, builtBy, NPO Energia]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: NPO Energia
Context triple: [Kristall, builtBy, NPO Energia]
  • A. Engie
    Engie is a major French multinational utility company specializing in electricity, natural gas, and energy services, with a strong focus on renewable and low-carbon energy solutions.
  • B. Energetica
    Energetica is an interactive exhibition at Amsterdam’s NEMO Science Museum that explores the principles and applications of sustainable energy and natural forces.
  • C. Energodar
    Energodar is a Ukrainian city best known for hosting the Zaporizhzhia Nuclear Power Plant, the largest nuclear power station in Europe.
  • D. E-CO Energi
    E-CO Energi is a Norwegian energy company primarily involved in the production and distribution of hydroelectric power.
  • E. RSC Energia chosen
    RSC Energia is a leading Russian spacecraft and rocket manufacturer best known for designing and operating crewed spacecraft and space station modules, including key components of the Soyuz and Mir programs.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d80766a21881909f21a1b7421d3b8a completed April 9, 2026, 8:09 p.m.
NER Named-entity recognition batch_69dbafba2c308190873efd15dfe26358 completed April 12, 2026, 2:44 p.m.
NED1 Entity disambiguation (via context triple) batch_69f76ba9fccc81908ec2e33d66aae8ea completed May 3, 2026, 3:37 p.m.
Created at: April 9, 2026, 9:44 p.m.