Triple
T13522498
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | O’Sullivan Dam |
E322932
|
entity |
| Predicate | waterSource |
P4102
|
FINISHED |
| Object | Columbia River via Columbia Basin Project canals |
E59466
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Columbia River via Columbia Basin Project canals | Statement: [O’Sullivan Dam, waterSource, Columbia River via Columbia Basin Project canals]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Columbia River via Columbia Basin Project canals Context triple: [O’Sullivan Dam, waterSource, Columbia River via Columbia Basin Project canals]
-
A.
Columbia Basin Project
chosen
The Columbia Basin Project is a large-scale irrigation and hydroelectric development in central Washington State that distributes water and power from the Grand Coulee Dam to support agriculture, industry, and communities across the region.
-
B.
Columbia River hydropower system
The Columbia River hydropower system is an extensive network of dams and generating facilities that provides a major share of the Pacific Northwest’s electricity while also supporting irrigation, navigation, and flood control.
-
C.
Columbia–Snake River lock system
The Columbia–Snake River lock system is a series of navigation locks and dams on the Columbia and Snake Rivers that enables barge traffic deep into the interior Pacific Northwest, supporting regional commerce, irrigation, and hydropower generation.
-
D.
Columbia River Basin
The Columbia River Basin is a vast watershed in the Pacific Northwest that drains portions of seven U.S. states and British Columbia into the Columbia River, supporting major ecosystems, agriculture, and hydroelectric power.
-
E.
Deschutes Project
The Deschutes Project is a U.S. Bureau of Reclamation irrigation and water management development in central Oregon that supplies water for agriculture, municipalities, and wildlife habitat along the Deschutes River basin.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d80766a21881909f21a1b7421d3b8a |
completed | April 9, 2026, 8:09 p.m. |
| NER | Named-entity recognition | batch_69dbafa535cc81908d0018fef81a2848 |
completed | April 12, 2026, 2:43 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69f7549a215c8190a0b18c505d8ca504 |
completed | May 3, 2026, 1:58 p.m. |
Created at: April 9, 2026, 9:44 p.m.