Triple

T1351932
Position Surface form Disambiguated ID Type / Status
Subject Kosi E28900 entity
Predicate hasBarrage P11345 FINISHED
Object Kosi Barrage E160353 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Kosi Barrage | Statement: [Kosi, hasBarrage, Kosi Barrage]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Kosi Barrage
Context triple: [Kosi, hasBarrage, Kosi Barrage]
  • A. Kosi Barrage chosen
    Kosi Barrage is a major flood-control and irrigation structure built across the Kosi River near the India–Nepal border.
  • B. Guddu Barrage
    Guddu Barrage is a major irrigation and flood-control structure on the Indus River in Pakistan, crucial for distributing water to agricultural lands in Sindh and Balochistan.
  • C. Prakasam Barrage
    Prakasam Barrage is a major masonry dam and road bridge in Vijayawada, Andhra Pradesh, that regulates the Krishna River and supports irrigation and water supply for the surrounding region.
  • D. Hathni Kund Barrage
    Hathni Kund Barrage is a major diversion and flood-control structure on the Yamuna River in the Indian state of Haryana, crucial for regulating water supply to northern India.
  • E. Okhla Barrage
    Okhla Barrage is a major dam and bridge structure on the Yamuna River near Delhi, India, used for irrigation, flood control, and regulating water flow.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a498571d248190a0ac9eb02d97097f completed March 1, 2026, 7:49 p.m.
NER Named-entity recognition batch_69a4c26b1b4881908ae4b1b2c9b268a0 completed March 1, 2026, 10:49 p.m.
NED1 Entity disambiguation (via context triple) batch_69ace566694c81909b07143855014884 completed March 8, 2026, 2:56 a.m.
Created at: March 1, 2026, 7:56 p.m.