Triple

T13515031
Position Surface form Disambiguated ID Type / Status
Subject Váh River E322736 entity
Predicate hasDam P8736 FINISHED
Object Nosice Dam
Nosice Dam is a hydroelectric dam on the Váh River in Slovakia, used for power generation, flood control, and water management.
E1073384 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Nosice Dam | Statement: [Váh River, hasDam, Nosice Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Nosice Dam
Context triple: [Váh River, hasDam, Nosice Dam]
  • A. Rossens Dam
    Rossens Dam is a large concrete arch-gravity dam on the Sarine River in the canton of Fribourg, Switzerland, primarily used for hydroelectric power generation and creating the Lake of Gruyère reservoir.
  • B. Belver Dam
    Belver Dam is a hydroelectric dam on the Tagus River in Portugal, used primarily for power generation and river flow regulation.
  • C. Nisramont Dam
    Nisramont Dam is a hydroelectric and recreational dam in the Belgian Ardennes, forming a large reservoir on the Ourthe River near La Roche-en-Ardenne.
  • D. Kremasta Dam
    Kremasta Dam is a major hydroelectric and water management dam in western Greece, forming one of the country’s largest artificial lakes.
  • E. Merwin Dam
    Merwin Dam is a hydroelectric dam on Washington State’s Lewis River that forms Lake Merwin and generates power for the region.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Nosice Dam
Triple: [Váh River, hasDam, Nosice Dam]
Generated description
Nosice Dam is a hydroelectric dam on the Váh River in Slovakia, used for power generation, flood control, and water management.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Nosice Dam
Target entity description: Nosice Dam is a hydroelectric dam on the Váh River in Slovakia, used for power generation, flood control, and water management.
  • A. Rossens Dam
    Rossens Dam is a large concrete arch-gravity dam on the Sarine River in the canton of Fribourg, Switzerland, primarily used for hydroelectric power generation and creating the Lake of Gruyère reservoir.
  • B. Belver Dam
    Belver Dam is a hydroelectric dam on the Tagus River in Portugal, used primarily for power generation and river flow regulation.
  • C. Nisramont Dam
    Nisramont Dam is a hydroelectric and recreational dam in the Belgian Ardennes, forming a large reservoir on the Ourthe River near La Roche-en-Ardenne.
  • D. Kremasta Dam
    Kremasta Dam is a major hydroelectric and water management dam in western Greece, forming one of the country’s largest artificial lakes.
  • E. Merwin Dam
    Merwin Dam is a hydroelectric dam on Washington State’s Lewis River that forms Lake Merwin and generates power for the region.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d80766a21881909f21a1b7421d3b8a completed April 9, 2026, 8:09 p.m.
NER Named-entity recognition batch_69dbafa0ed508190b2855171b1945e84 completed April 12, 2026, 2:43 p.m.
NED1 Entity disambiguation (via context triple) batch_69fbac7a1ee88190951de590a4a07d6f completed May 6, 2026, 9:02 p.m.
NEDg Description generation batch_69fbad35be6c8190aa329fa947cbdcd9 completed May 6, 2026, 9:05 p.m.
NED2 Entity disambiguation (via description) batch_69fbae42ef2c8190b653d95de94042bc completed May 6, 2026, 9:10 p.m.
Created at: April 9, 2026, 9:44 p.m.