Triple
T13512817
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Patria Nemo |
E322680
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | mortar turret system |
C14525
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: mortar turret system Context triple: [Patria Nemo, instanceOf, mortar turret system]
-
A.
artillery turret design
chosen
Artillery turret design is the conceptual and engineering process of configuring a protected, rotating weapons mount that optimizes firepower, accuracy, crew safety, and integration with a vehicle or structure.
-
B.
self-propelled siege mortar
A self-propelled siege mortar is a heavily armored, mobile artillery platform mounting a large-caliber, high-arc mortar designed to advance with or behind frontline forces and deliver powerful indirect fire against fortified positions.
-
C.
masonry fort
A masonry fort is a fortified structure built primarily from stone or brick, designed to provide durable defensive protection against attacks.
-
D.
turret clock
A turret clock is a large mechanical timekeeping device mounted in a tower or high structure, designed to drive external clock faces and often strike bells to indicate the time to a surrounding community.
-
E.
tank gun
A tank gun is a large-caliber, high-velocity cannon mounted on an armored fighting vehicle, designed primarily for engaging and destroying enemy armor, fortifications, and other battlefield targets.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d80766a21881909f21a1b7421d3b8a |
completed | April 9, 2026, 8:09 p.m. |
Created at: April 9, 2026, 9:44 p.m.