Triple
T13486224
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Pons Aelius |
E318510
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | bridge in Rome |
C22181
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: bridge in Rome Context triple: [Pons Aelius, instanceOf, bridge in Rome]
-
A.
Seine bridge
A Seine bridge is a structure that spans the River Seine, providing a crossing for pedestrians, vehicles, or trains while often serving as an architectural and cultural landmark within its urban setting.
-
B.
tram bridge
A tram bridge is a dedicated elevated structure that carries tram tracks over obstacles such as roads, rivers, or other terrain features to ensure uninterrupted tramway operation.
-
C.
Ottoman bridge
An Ottoman bridge is a stone or masonry arch bridge built during the Ottoman Empire, typically featuring elegant arches, narrow decks, and often serving as both a transportation route and a social or commercial gathering space.
-
D.
bridge in Moscow
A bridge in Moscow is a structural crossing over the Moskva River or other waterways in the city, serving both transportation needs and often acting as an architectural landmark within the urban landscape.
-
E.
river bridge
chosen
A river bridge is a structure built to span a river, providing a stable pathway for vehicles, pedestrians, or rail traffic to cross from one bank to the other.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d806b6bfec819089222715b2e86c8e |
completed | April 9, 2026, 8:06 p.m. |
Created at: April 9, 2026, 9:42 p.m.